The Castle Peak Hospital Block A Boiler Room 2

The Castle Peak Hospital Block A Boiler Room 2


                  Project      :   Hot Water Boiler Replacement 

                  Place         :   The Castle Peak Hospital – Block A (Boiler Room 2)
                  Year     :      December, 2012 



Equipments provided for the project, including

 


 (1) 3 units    IVAR  Hot Water Boiler SupeRAC 290 (热水锅炉)
                     输出功率 Nominal Output     :   291 kW (250,000 Kcal/hr)
                     工作压力 Working Pressure   : 6 bar
                     原 产 地 Origin  : 意大利 Italy



 (2) 3 units    ECOFLAM  Town Gas Burner MAX GAS 500 P TL (煤气燃烧器及管道组件)
                     控制模式 Operation Mode   :  一段火控制 1-stage (on-off)
                     输出功率 Output Capacity   :  120~500 kW (103,200 ~ 430,000 Kcal/hr)
                     燃    料   Fuel       :  香港城市煤气 Hong Kong Town Gas
                     原 产 地  Origin  :  意大利 Italy
                     气体管导 Gas Train  :   电磁阀 gas solenoid valve VCS 350 – Rp 2”, 

                                                         稳压阀含过滤网 

                                                           governor w/filter element FGDR 50 – Rp 2”, 

                                                         啡色弹簧 brown spring FGDR 50 



  (3)  3 units   IVAR  Hot Water Calorifier (热储水缸 3000公升)  [Origin : Italy / 原产地 : 意大利]

                     Cap. 3000 litre, vertical, in galvanized carbon steel, with coil in finned copper 

                    mq 6.34 for max. hot water temperature 85℃, max. working pressure 6 bar, 

                    complete with magnesium anode and with insulating cover in polyurethane 

                    50mm thickness,Dimension  Ø1250mm x height 2800mm Capacity 102 kW/h 

                    (calculated with primary inlet temperature 85℃ and return 70℃; secondary 

                   inlet 15℃ and storage at 60℃)



 (4)  Pictures taken for the above-mentioned equipment in the Boiler Room of The Castle Peak Hospital Block are shown page 2 ~ 4 respectively.


 

(1) Boiler Room (hot water boilers, burners, calorifiers, control panel, pipelines)


  

 

 

 

   

 

 

 



(2) 3 units x IVAR Hot Water Boiler SupeRAC 290 (Output : 291 kW, Working Pressure: 6 bar)
    including ECOFLAM MaxGas 500 P TL Gas Burner (Output: 120~500 kW)
    [categorized as BOILER No. 1, No. 2 & No. 3 in the Boiler Room]

  

  


 


  


 



(3) 3 units x IVAR Hot Water Calorifier
    Cap. 3000 litre with insulating cover in polyurethane 50mm thickness

    [categorized as Calorifier No. 1, No. 2 & No. 3 in the Boiler Room]


 

   

 

  

 

 

 

 

   