The Castle Peak Hospital Block D

The Castle Peak Hospital Block D

              Project   :   Hot Water Boiler Replacement 

        Place          :   The Castle Peak Hospital – Block D, Hong Kong

        Year       :   August, 2013

 


Equipments provided for the project, including

(1) 1 unit   IVAR  Hot Water Boiler SupeRAC 150 (熱水鍋爐)
                    輸出功率 Nominal Output    :  151.2 kW (130,000 Kcal/hr)
                    工作壓力 Working Pressure :  6 bar
                    原 產 地 Origin  :  義大利 Italy



(2) 1 unit  ECOFLAM  Town Gas Burner MAX GAS 350 P TL 
                   控制模式 Operation Mode   :  一段火控制 1-stage (on-off)
                   輸出功率 Output Capacity   :  70~350 kW (60,200 ~ 430,000 Kcal/hr)
                   燃    料   Fuel     :   香港城市煤氣 Hong Kong Town Gas
                   原 產 地  Origin  :   意大利 Italy
                   氣體管導 Gas Train :   gas solenoid valve VCS 240 – Rp 1½”, 
                                                     governor w/filter element FGDR 40 – Rp 1½”, 
                               brown spring FGDR 32-40 (65~139 mbar)



(3) Pictures taken for the above-mentioned equipment in the Boiler Room of The Castle Peak Hospital Block are shown page 2 ~ 4 respectively.



(1)  1 unit x IVAR Hot Water Boiler SupeRAC 150 (Output : 151.2 kW, Working Pressure: 6 bar)

    




  


  



(2) 1 unit x ECOFLAM MaxGas 350 P TL Gas Burner (Output: 70~350 kW)
    with gas solenoid valve VCS 240 – Rp 1½”, governor w/ filter element FGDR 40 – Rp 1½”
  
    

  