Project : Hot Water Boiler Replacement
Place : The Castle Peak Hospital – Block D, Hong Kong
Year : August, 2013
Equipments provided for the project, including
(1) 1 unit IVAR Hot Water Boiler SupeRAC 150 (熱水鍋爐) 輸出功率 Nominal Output : 151.2 kW (130,000 Kcal/hr)
工作壓力 Working Pressure : 6 bar
原 產 地 Origin : 義大利 Italy
(2) 1 unit ECOFLAM Town Gas Burner MAX GAS 350 P TL
控制模式 Operation Mode : 一段火控制 1-stage (on-off)
輸出功率 Output Capacity : 70~350 kW (60,200 ~ 430,000 Kcal/hr)
燃 料 Fuel : 香港城市煤氣 Hong Kong Town Gas
原 產 地 Origin : 意大利 Italy
氣體管導 Gas Train : gas solenoid valve VCS 240 – Rp 1½”,
governor w/filter element FGDR 40 – Rp 1½”,
brown spring FGDR 32-40 (65~139 mbar)
(3) Pictures taken for the above-mentioned equipment in the Boiler Room of The Castle Peak Hospital Block are shown page 2 ~ 4 respectively.
(2) 1 unit x ECOFLAM MaxGas 350 P TL Gas Burner (Output: 70~350 kW)
with gas solenoid valve VCS 240 – Rp 1½”, governor w/ filter element FGDR 40 – Rp 1½”